Deprecated: Array and string offset access syntax with curly braces is deprecated in /home/gorkemltd/public_html/engine/classes/templates.class.php on line 239 Water Structures - Görkem İnşaat Ltd. https://www.gorkeminsaat.com.tr/ tr Water Structures - Görkem İnşaat Ltd. DataLife Engine BADRA WATER TREATMENT PLANT https://www.gorkeminsaat.com.tr/water-structures/23-badra-water-treatment-plant.html https://www.gorkeminsaat.com.tr/water-structures/23-badra-water-treatment-plant.html admin Mon, 31 Aug 2020 10:06:37 +0300 DOKAN WATER TREATMENT PLANT https://www.gorkeminsaat.com.tr/water-structures/22-dokan-water-treatment-plant.html https://www.gorkeminsaat.com.tr/water-structures/22-dokan-water-treatment-plant.html
In this respect, all piping, electrical, mechanical supply and installation had been performed, including SCADA and automation system. The facility had been delivered as fully functional.]]>
admin Mon, 31 Aug 2020 10:01:25 +0300
IFRAZ WATER TREATMENT PLANT https://www.gorkeminsaat.com.tr/water-structures/21-ifraz-water-treatment-plant.html https://www.gorkeminsaat.com.tr/water-structures/21-ifraz-water-treatment-plant.html
* Treatment Plant with 6 clarifiers
* Main and intermediate pump stations
* 20 000 m3 main reservoir
* Full electrical and mechanical system
* 1500mm, 31,7km water transmission line

Located in the Baghdad Green Zone, next to the Prime Ministry Building, The Prime Ministry Guesthouse is a 4 storey, guesthouse building, with a designed and equipped as a 5+ star hotel quality.

The total land area is 39.000m², total construction area is 11.500m²]]>